Tuesday, January 29, 2013

Day 15 - Roughing It Again

Today the plumbers continued their work on roughing in the plumbing.  To fill in the trenches, a couple of loads of road base type material was delivered.
Fill Material

Here are several shots of the piping, trenching, and filling activity that went on today.

Master Suite
Note the water tank in the background of the picture below.  At the end of the workday the plumbers pumped water into the entire network of piping.  They will check all joints for leaks tomorrow.


Kitchen Area with Powder room to the Left - tank in background

The early stages of the trench for septic line running to the septic field southwest of the house have been dug.

Septic Tank Trench
Here's a shot looking from the mudroom to the front of the house.

More trenching to be filled

Most of the pipes were temporarily capped as part of the process.


Bruce decided to take his business outside today and set up a temporary office watching the guys doing their rough in work.

Office hours at the Ranch
We will be out again tomorrow to check the progress.  It's movin' right along.